• No-Basket Heat Treatment Line for Aluminum Wheel
  • No-Basket Heat Treatment Line for Aluminum Wheel
  • No-Basket Heat Treatment Line for Aluminum Wheel
  • No-Basket Heat Treatment Line for Aluminum Wheel
  • No-Basket Heat Treatment Line for Aluminum Wheel
  • No-Basket Heat Treatment Line for Aluminum Wheel

No-Basket Heat Treatment Line for Aluminum Wheel

Transport Package: Container
Trademark: ND
Origin: China
Customization:
Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Product Description

1.       Technical Documents

1.1    Basic Requirement

  1.1.1         Loading type:  no basket, automatic feeding
  1.1.2         Energy source: nature gas
  1.1.3         Running method: roller conveyor type, 3 layers conveying, completely continuous operation
  1.1.4         Layout: the line is arranged in U-shape
  1.1.5         Utility condition :
a)       Power: 3phase ,AC380/220 V±10%  50Hz
b)       Working temperature: -5~45ºC
maximum relative humidity:85%
c)        Compressed air:0.4~0.6 MPa
d)       Water pressure :0.2~0.3MPa
e)       Nature gas pressure:0.04~0.1MPa
calorific value:8200~8400kcal/Nm3

1.2    Equipment Functional Requirement

1.2          
  1.2.1         Process requirement: meet the Al. wheel T6 heat treatment process requests
  1.2.2         solution furnace:
50min +230min =280min(200min~360min)
50min heating + 230min holding= 280min inside furnace (200min ~360min, adjustable )
  1.2.3         Aging Furnace
30min heating + 170min holding = 200min inside furnace (120min ~ 270min adjustable )
  1.2.4         production capacity of each line
1.3 
Production rate: 1,000,000pcs/year,(24h/day, 300workding days/year, specific wheel size: 17×10 inch, φ476mm)
Hourly production rate: 1000000÷300÷24=138.89pcs /h
Each cycle loaded wheels number:
one layer loaded with 5 wheels, 3 layers,
5×3=15pcs
Hourly working cycles: 138.89÷15 =9.266 cycle /h
Cycle time : 60÷9.266=6.48min

1.3    detailed data of working cycle

Annual production rate 1,000,000 pcs/year
Working days 300 Day
Working hours 24 H
Hourly production rate 138.89 pcs/h
Layers of roller conveyor 3 Layer
Wheel numbers per layer 5 Pcs
Cycle time 6.48 min/cycle
solution furnace
Specific heating up time 50 min
Specific holding time 230 min
Specific wheel size (diameter ) :476 Mm
Distance between each row of wheels 100 Mm
Furnace length 26089 Mm
Transfer speed of parts inside furnace chamber 88.9 mm/min
aging furnace
Specific heating up time 30 Min
Specific holding time 170 Min
Specific wheel size (diameter ) 476 Mm
Distance between each row of wheels 100 Mm
Furnace length 18978 Mm
Transfer speed of parts inside furnace chamber 88.9 mm/min
 

2.       Supply Scope

No. Item Unit Qty
1 Layering Feeder 1 set
2 Feeding of solution furnace 1 set
3 Solution furnace 1 set
4 Quenching unit and quenching transfer unit after quenching 1 set
5 Transfer unit and water drain unit 1 set
6 Aging furnace feeding unit 1 set
7 Aging furnace 1 set
8 Discharging unit 1 set
9 Layering unloading unit 1 set
10 Combustion system 6 set
11 Chimney (5 meters higher above the workshop building) 1 set
12 Control system 1 set
13 Solution furnace heat-recovery unit 1 set
14 Central Integrated Control System (exclude the control room ) 1 set

No-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum WheelNo-Basket Heat Treatment Line for Aluminum Wheel

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
213
Year of Establishment
2000-06-28